Joramco - New Aircraft Maintenance Facility
Pharmaceutical Production Facility Algeria
International Pharmaceutical Industries
NPK Fertilizer Project
|
|
|
Joramco
New Aircraft Maintenance Facility |
|
|
| |
A new aircraft maintenance facility at the Queen Alia International Airport will be built on a 70,000 m2 land located adjacent to and complementing their existing maintenance facilities at the said Airport. This facility will be dedicated to providing aircraft light and heavy maintenance (A through D checks) for Airbus A320, A330, A340, and Boeing B737 models.
|
The Project’s initial phasing requires the preparation of a Master Plan for the entire Land Plot of some 70,000 sqm. to include a two Span Portal Frame (85 m span per portal) Hangar to be used for the A340 models, in addition to another two span portal frame hangers of the same span but with lower eve height for the maintenance of other models, mainly the 737 models and the like.
The Hanger design should also allow for the possibility for an additional span extension in the future, and around 50,000 sq. metre of aircraft parking area, to be constructed over one or two phases.
The Hangar should fully enclose a minimum of two, A 340 / A-330 aircrafts or a multiple of A-320 / B737 aircraft or other fleet aircraft that can be accommodated without A-340's being present. The Hangars structure will be fully enclosed and include hangar doors along the airside portion of the Hangar. The A-340 Hangars will have sufficient interior vertical clearance to permit jacking of the A-340 for wheel removal and/or swinging of the gear with at least a 2 m clearance to structure.
|
| |
|
|
|
| International Pharmaceutical Industries |
|
 |
 |
 |
| International Pharmaceutical Industries |
 |
 |
|
 |
 |
|
 |
|
| Riyadh, Saudi Arabia |
Master planning, conceptual and detailed design and complete tender documents as well as supervision of construction of 24800 sqm facilities, comprising the following factories:
|
- Non BetaLactum Plant to include liquids, semi solids, inhalers, soft
gelatin capsules, and solid dosage form.
- BetaLactum Plant to include cephalosporin and penicillin factories
Utilities, administration, laboratories, external services, cafeteria, and infrastructure works.
|
| |
|
|
|
| Pharmaceutical Production Facility Algeria |
|
 |
 |
 |
Pharmaceutical
Production Facility |
 |
 |
|
 |
 |
|
 |
|
| |
The Project is 7000 m2 in terms of total built up area, and consists of two plants as follows:
1. Plant I non (Beta) - Lactam
product, to produce:
- Solid Dosage Forms
(Tablets, Capsules, Dry Syrups)
- Semi-Solids (Ointments,
Creams), Suppositories
- Liquids
|
2. Plant II (Beta) - Lactam product, to produce:
- Cephalosporine Products or Penicillines
3. Ancilary buildings & site work:
- An Administration and a Q. C. Building
- A Supporting Services Building
- Waste Treatment Plant
- Water Treatment Plant
- Incinerator Plant
- Service Roads & Car Parks
- Site Infrastructure & External Works
- Services and Utilities as necessary
The scope of services includes the provision of design services, documentation & coordination with a local design office for the purpose of licensing & data collection during design.
Design services include full master planning in addition to architectural, structural, mechanical, electrical as well as complete tender & construction documents starting from the master plan & conceptual designs through to preliminary designs, design development as well as tendering services activities & final design documents.
|
| |
|
|
|
| NPK Fertilizer Project |
|
|
| |
Client: Chiyoda Corporation
Location: Aqaba, Jordan
Scope:
Complete design services for the project's components that include; administration building, workshops, raw material storage building,
|
off-specs building with scrapers and conveyors, truck and loading facilities, steel circular storage tanks, operations building, site works and infrastructure.
|
| Top |
|
|
|
 |
|