ARABTECH JARDANEH Home page SItemap
About AJ
Competencies
Whats New
Careers
Contact Us
Taj Mall
 
The project is envisioned to primarily be an upscale retail complex that consists of a multi purpose facility which caters for a wider spectrum of tenants
 
  More Projects  
Medical & Health Care Hotels & Tourestic Industrial Public & Commercial Educational Residential & Housing
 
     
  Aden Educational Hospital

Hodaidah Central Hospital

Al Ahli Hospital

New Western District Hospital In Dukkhan

King Hussein Hospital

Queen Alia Heart Institute


 
Aden Educational Hospital  
Aden Educational
Hospital
 
 
The Aden Educational Hospital in Yemen is expected to host 400 beds with a total built up area of 40,000 m2. Arabtech Jardaneh is to provide the following services;
 
Feasibility Study, Pre-Design Surveys and the Engineering Consultancy Services solicited for the Design and Construction Supervision of the Aden Educational.

 
 
Hodaidah Central Hospital  
Hodaidah Central
Hospital
 
 
Hodaidah Central Hospital in Yemen is expected to host 350 beds with a total built up area of
34,500 m.sq.

Arabtech Jardaneh is to provide the following services;
Feasibility Study , Pre-Design Surveys and the Engineering Consultancy Services solicited for the Design and Construction Supervision of the Hodaidah Central Hospital.

 
 
Al Ahli Hospital  
Al Ahli Hospital
 
 
Al Ahli Hospital (the first private hospital in Qatar) is a 220 bed general hospital including a Cardiac Center and an IVF unit, with a total built up area of 27758 m2.

Other Site Buildings including Administration,

meeting rooms with all related facilities Mosque, Generator and Pump Rooms, Utilities and Privacy Wall, Guard Rooms and Shaded Garages. The total built up area for the Annexed buildings is 15215 m2.

The provided services included Conceptual, preliminary as well as detailed design and preparation of hospital tender documents.

 
 
Western District Dukkhan Hospital  
Dukkhan Hospital
 
 
A hospital compound project to be constructed in Dukhan, 100 km west of Doha, Qatar, to provide high quality healthcare facilities to the current and future residents of the Country. The total project built up area is 90,000 sqm including all facilities.

The hospital complex is to be constructed on a 475x 425 m plots (200,000 m 2) designated for the hospital compound.

A 50 Bed Hospital Building complex of 30,200 m2 built up area Accommodation Compound of total 48,000 m2 of built up area including the following;

1. Family Accommodation for 40 Nos. Medical staff (senior and junior doctors)
2. Nurse hostels for 350 nurses
3. Accommodation of 100 Nos.; 3 bedroom apartments for administrative staff (married and single)
4. Accommodation for 200 Nos.; other staff
5. Recreation facilities (health club, tennis court, swimming pool, gymnasium, children's ply area,)  
AJ's scope of services comprised of, the concept, preliminary, and detailed design for hospital and accommodation compounds, preparation of master plan, architectural, civil, structural, loss prevention, electrical, landscaping, and building services
Top
 
King Hussein Hospital  
King Hussein
Hospital
 
 
The King Hussein Teaching Hospital at the University of Science And Technology in Irbid, North Jordan is a high-rise building built in the mid nineties where Arabtech Jardaneh was engaged on both the upgrading of designs and full supervision of construction.

The Hospital is a 17 storey building with a total built up area of 105,000 m2 and some 667 beds. The services included updating the original design of the hospital as well as updating the electromechanical designs of the different departments of the hospital and full supervision and home office support services
 
 
Queen Alia Heart Institute  
Queen Alia
Heart Institute
 
 
The Queen Alia Heart Institute at the Al Hussein Medical City in Amman built in the mid eighties where Arabtech Jardaneh performed on both the designs and full supervision of construction in joint venture with HEERY International
The new extension included a 5-storey and a basement annex building, which will be connected to the existing 100-bed hospital, to house additional 70 beds, the total area of the extension is 14,000 m2. All construction works related to the said extension completed in 2003.
Top
 
 
   Coming Soon
 
Copyright © 2007 Arabtech Jardaneh. All rights reserved.